Anonymous poll: how long does your production build take? How long does it take you to see a change live on your production site after starting a build?
11 replies
(independent of any specific site generator or tool)
@11ty I use a shell script that builds the 11ty site and rsyncs it to the server. Rarely more than a minute, unless I'm building on my PineTab2 (which can do it, but is slow as heck)
@kelson do you have the 4GB ram version or the 8GB?
@11ty is this a lowkey way to see the average sizes of websites made with 11ty? :D either way the build is near-instant for me, kudos on that!
@dobody working on some deployment improvements! faster faster faster!!
@11ty 23 sec for the 11ty bundle build, and then just under a minute total (incl that 23 sec) to run a pagefind index and then use wrangler to upload the site to Cloudflare. Mucho cache savings in all that.
@bobmonsour we love a finely tuned cache 👍
@11ty build step? ~2 min. Approval gate to push to prod? LMAO. Deploy step? ~10 sec.
@11ty It used to be much longer, but I started to cache everything (test build on GitHub Actions, production builds on Netlify), and now it’s always under 30 seconds.